Plan Ledger DOL Form 5500 · updated monthly

Waltonen Engineering, Inc.401(k)

WALTONEN ENGINEERING DEFERRED COMPENSATION THRIFT PLAN · WARREN, MI · plan year 2022

Reported admin expense ratio · 2022
0.06%

Peer grade: B+ · admin costs + employer contributions vs same-size plans · how grading works

Waltonen Engineering, Inc. reported $3,963 in plan administrative expenses for 2022: 0.06% of average plan assets, lower than ~75% of peers. Employer contributions averaged $1,018 per active participant. This ratio covers administrative expenses reported on the plan's Schedule H only; fund-level expense ratios are not included in public structured data — see methodology.

The plan sits in the $1M–$10M size bracket, benchmarked here against 30,021 comparable plans and shown alongside other professional & technical services employers. By assets it is among the smaller plans on file in Michigan (1,883rd of 2,619), and 9,340th of 11,654 in professional & technical services. In 2022, employees put in $3.93 for every $1.00 the employer contributed.

Plan summary
Net assets, end of year$6,138,815
Participants with balances85
Active participants116
Employer contributions$118,105
Employee contributions$464,027
Employer contribution per active participant$1,018
Average account balance$72,221
Benefits paid to participants$131,918
Plan auditUnmodified (clean) audit opinion
AuditorUHY LLP
The Waltonen Engineering, Inc. 401(k) match · 2022
Employer contribution per active participant$1,018
Median for plans this size$1,114

Waltonen Engineering, Inc.'s 2022 employer contribution ran below the $1,114 median for plans its size. Filings report dollars actually contributed, not the match formula; the formula itself (for example, 50% of the first 6% of pay) lives in the plan's summary plan description from HR.

What these fees cost you

Annual cost at the plan's reported 2022 administrative ratio, against the median plan its size; fund expense ratios are extra. Compare any plan.

Administrative cost history1
2022$3,963 · 0.06%
Same employer
Similar plansProfessional & Technical Services · Michigan
Asphalt Specialists, LLC MI$7.0M · 0.08%
Hcl Global Systems, Inc. MI$6.9M · 0.52%
Fieldstone A&E, LLC MI$6.8M · 0.65%
Ansara Corporation MI$5.8M · 0.13%

Why are you looking at this plan?

Compare

Source: U.S. Department of Labor, Form 5500 series, EIN 383386211 · Verify on EFAST2 · Amounts are as reported by the plan sponsor for the plan year shown.