Mrb Group Engineering, Architecture, and Surveying, D.P.C.401(k)
MRB GROUP ENGINEERING, ARCHITECTURE, AND SURVEYING, D.P.C. 401(K) PROFIT SHARING PLAN · ROCHESTER, NY · plan year 2024
Peer grade: B+ · admin costs + employer contributions vs same-size plans · how grading works
Mrb Group Engineering, Architecture, and Surveying, D.P.C. reported $3,559 in plan administrative expenses for 2024: 0.02% of average plan assets, lower than ~75% of peers. Employer contributions averaged $2,130 per active participant. This ratio covers administrative expenses reported on the plan's Schedule H only; fund-level expense ratios are not included in public structured data — see methodology.
Across the 3 years on file its reported administrative ratio has held roughly steady near 0.015%. The plan sits in the $10M–$50M size bracket, benchmarked here against 27,838 comparable plans and shown alongside other professional & technical services employers. By assets it is the 2,190th-largest of 5,648 plans among New York employers on file, and the 4,724th of 11,654 in professional & technical services. In 2024, employees put in $5.44 for every $1.00 the employer contributed.
Mrb Group Engineering, Architecture, and Surveying, D.P.C.'s 2024 employer contribution ran below the $2,416 median for plans its size. Filings report dollars actually contributed, not the match formula; the formula itself (for example, 50% of the first 6% of pay) lives in the plan's summary plan description from HR.
Annual cost at the plan's reported 2024 administrative ratio, against the median plan its size; fund expense ratios are extra. Compare any plan.
Compensation shown is direct payments from plan assets reported on Schedule C. Providers paid through fund revenue-sharing appear as indirect.
Why are you looking at this plan?
Source: U.S. Department of Labor, Form 5500 series, EIN 161242288 · Verify on EFAST2 · Amounts are as reported by the plan sponsor for the plan year shown.